Client
Goosebumps Bakery
Commissioning Date
December 2023
Application
Peak Shaving & Energy Arbitrage
Country
South Africa
Project Description
Goosebumps Bakery partnered with SustainGroup to install a SUSTAIN STORAGE™ containerised battery energy storage system (BESS) at their state-of-the-art production hub in Blackheath, Cape Town.
Housed in a 40 ft ISO-engineered container, the system integrates a 500 kW ATESS PCS inverter and 1,003 kWh high-voltage LFP batteries from IES. This turnkey solution ensures dependable backup power, peak-shaving, and energy optimisation, enabling Goosebumps to maintain uninterrupted operations while reducing their carbon footprint.
As a pioneer in South Africa’s bakery industry since 1996, Goosebumps has grown into a nationwide supplier serving over 3,000 retail partners. This energy innovation strengthens their commitment to operational excellence and sustainable manufacturing practices.
Technical Information
- PCS Inverter: 500 kW
- Battery Storage: 1,003 kWh
- Rated Power: 500 kW
- Container Quantity: 1
- Container Size: 40 ft



